My View: Superintendent Richard Safier

In Massachusetts, the Massachusetts School Building Authority governs school building projects.

The benefits of working with the MSBA are twofold:

A.) The MSBA closely regulates and monitors all aspects of the entire construction process, thus ensuring that from start to finish the work is of the highest quality;

B.) In working through the MSBA, the city of Gloucester stands to receive a minimum of a 48 percent reimbursement for the entire project.

In early 2012, the city of Gloucester was accepted by the Massachusetts School Building Authority to develop plans for an addition, renovation, or new construction of the West Parish Elementary School.

This acceptance was the result of an initial “statement of interest” — first submitted back in 2009, but was delayed and then raised again in 2012 as an interest on the part of the city and the School Department. That statement of interest, then and now, was voted upon and supported by the City Council.

Having been approved, the District (city and School Department) entered into what is termed an eligibility period. Based upon information submitted to the MSBA, we were then invited to enter into the next phase of the process, the feasibility study. Funding for the feasibility study was unanimously approved by the City Council.

The purpose of the feasibility study is to have professional engineers and architects study the conditions for the project and provide that information to a designer. This review requires an analysis of all aspects of the current conditions of the buildings as well as the grounds around the buildings for possible construction capability (ledge, clay, wetlands, etc.).

The designer uses that information to develop several possibilities for a new West Parish: either adding to the existing building, renovating the existing building, or constructing a new building.

While the physical spaces were being analyzed, school department personnel were working with the consultants (Dore and Whittier) on developing an “educational narrative” which discusses many aspects of the current and future educational programs.

Text Only | Photo Reprints
Letters/My View

NDN Video
'Hunger Games: Mockingjay Part 1' Sneak Peek GMA: Dog passes out from excitment to see owner Chapter Two: Designing for Naomi Watts Baseball Hall of Famers Inducted Florida Keys Webcam Captures Turtles Hatching Morgan Freeman Sucks Down Helium on 'Tonight Show' Robin Wright Can Dance! (WATCH) She's Back! See Paris Hilton's New Carl's Jr. Ad Big Weekend For Atlanta Braves In Cooperstown - @TheBuzzeronFox Chapter Two: Becoming a first-time director What's Got Jack Black Freaking Out at Comic-Con? Doctors Remove 232 Teeth From Teen's Mouth Bradley Cooper Explains His Voice in 'Guardians of the Galaxy' Deja vu: Another NYPD officer choke-holding a suspect 'Fifty Shades of Grey': Watch the Super Sexy First Trailer Now! Reports: Ravens RB Ray Rice Suspended For 1st 2 Games Of The Season Air Algerie plane with 119 on board missing over Mali Diamond Stone, Malik Newman, Josh Jackson and others showcase talent Free Arturo - The World's Saddest Polar Bear A Look Back at Batman On Film Through The Years