GloucesterTimes.com, Gloucester, MA

Latest Cape Ann News

October 30, 2012

Power to be cut to Fort Square so crews can repair Birdseye siding

National Grid will cut power to Fort Square as work crews try to repair a section of aluminium siding that peeled off the Birdseye building during the storm last night.

It is unknown when the power will be cut, according to city officials.

Winds from now Post-Tropical cyclone Sandy pulled off that section of siding along Fort Square, revealing a wall of torn yellow insulation. The winds set the peeled-back siding against a utility pole, energizing the metal last night. Crews responded this morning to fix the storm damage, but needed the power shut off so they could work, said Fire Chief and Emergency Management Director Eric Smith.

"We don't want parts of the building to injure somebody or take down the wires," said Smith.

Fort Square residents will lose power for between four and six hours, according to a statement from the Department of Public Works. The power will come back on once crews secure the siding. The area has also been pushed up to a "life safety" priority level with National Grid.



Steven Fletcher may be contacted at 1-978-283-7000 x3455, or sfletcher@gloucestertimes.com. Follow him on Twitter at @stevengdt.

 

 

Text Only | Photo Reprints
Latest Cape Ann News

Pictures of the Week
Your news, your way
Comments Tracker
AP Video Network
Ohio Woman Accuses 3 of Holding Her Captive Hunt for Ex-Teamster Boss Hoffa's Remains Ends Aug. Trial Set for Ohio Man in Triple Kidnapping Car Crash in NYC's East Village Injures 8 Obama Renews Call for Nuclear Reductions Raw: Car Jumps Curb in NYC, Injures 8 Unusual Heat Wave Bakes Alaska Raw: German President Welcomes President Obama Raw: Arizona Wildfire Scorches 8 Square Miles Raw: Huge Fire Near Yosemite National Park Kid Couture: Spending Big Bucks on Babies